In order to ensure the quality of wet spraying and improve the working efficiency of the wet spraying machine, the preparation work needs to be done before the wet spraying machine is started. What kind of preparation work needs to be done? Next, the author will discuss it for you.
1. First of all, clean up the wet spraying site, and there should be no gangue and debris;
2. Place the wet spraying machine stably, and connect the air, water pipelines and material conveying pipes. The arrangement of each pipeline should be straight, without sharp bends, and the joints should be tight and no air leakage;
3. Check whether the performance of the wet sprayer is in good condition, and whether the fasteners are firmly fixed, and then turn on the power supply for no-load trial operation to check whether the rotation is normal;
4. Set the wet spray range around the wet spray surface, and install the thickness mark in the wet spray area;
5. Prepare labor protection supplies for the wet spraying machine operator, and what precautions should be explained in advance in the wet spraying process;
6. Pull up the isolation belt around the wet spraying area, and unrelated personnel are not allowed to enter, to ensure that the wet spraying surface is not damaged after wet spraying.
After the above work is ready, rinse the wet spray surface with high-pressure feng shui, and then start the wet spray machine for wet spray.