Concrete pump easy to block location and elimination method Saintyol DAWIN Machinery teaches you

Concrete pump easy to block location and elimination method Saintyol DAWIN Machinery teaches you

Summary

Concrete pump has now become an indispensable member of engineering construction. In addition to the promotion of urban and rural construction, its own advantages are also very obvious, reducing labor force, shortening construction period, and improving project progress efficiency. The correct use of the concrete pump can not only improve the work efficiency, but also avoid the blockage of the concrete pump. Common concrete pump easily blocked positions and elimination methods are as follows:

Concrete pump easy to block location and elimination method Saintyol DAWIN Machinery teaches you
Concrete pump has now become an indispensable member of engineering construction. In addition to the promotion of urban and rural construction, its own advantages are also very obvious, reducing labor force, shortening construction period, and improving project progress efficiency. The correct use of the concrete pump can not only improve the work efficiency, but also avoid the blockage of the concrete pump. Common concrete pump easily blocked positions and elimination methods are as follows:
1. Blockage at the feed inlet
The feeding port is blocked, usually the pumping action and hydraulic system are normal, there is no abnormal sound and vibration, and there is large aggregate or agglomeration in the hopper, which is stuck or arched at the feeding port.
Elimination method: make the pump run in the reverse direction to destroy the agglomeration, make the concrete return to the hopper for re-mixing, and then pump in the forward direction. If it doesn't work, it needs to be cleaned manually and excluded.
2. Blockage at the outlet of the distribution valve
The discharge port is blocked, usually because the action of the pumping system of the concrete pump is suddenly interrupted, and there is an abnormal sound, and the equipment has strong vibration, but there is no corresponding vibration in the pipeline.
Elimination method: Pour cement slurry into the hopper, start the pump forward and reverse repeatedly, and force the passage to open. If this method is invalid, it can only be removed manually, remove the connecting pipe, and remove the debris in the valve.
3. The pipe valve is blocked
The blockage at the pipe valve is gradually formed. The main reason is that after the concrete pump has finished delivering the concrete, it is not flushed with high-pressure water in time, resulting in the concrete remaining in the pipe, which gradually thickens over time, accumulates and solidifies, and causes blockage.
Elimination method: After the concrete delivery pump finishes conveying concrete, be sure to rinse the pump body and S-pipe with high-pressure water. When the flushing is ineffective, the brazing can be used to remove the residue until it is completely clean.
4. Concrete pipeline is blocked
When the conveying pressure gradually increases, but the material level of the hopper does not drop, the outlet of the pipeline does not discharge, the pump vibrates, and the pipeline is accompanied by strong vibration and displacement, it can be determined that the pipeline is blocked. Judgment of blocked parts: blockages generally occur in elbows, tapered pipes, and areas with vibration. At this time, a small hammer can be used to strike along the pipeline, and the dull sound is the blockage; the crisp sound is normal. Listening with your ears, a rustling sound is normal, and a harsh sound is a blockage.
Elimination method: When the pipe is blocked, the method of percussion with a wooden hammer, combined with the forward and reverse pumps, can be used to dredge it; when the above methods are invalid, it means that the blockage is serious. Similarly, the method of repeating the forward and reverse pumps can be immediately adopted, and the concrete at the pump outlet can be gradually sucked back into the hopper for re-mixing and then transported. It is also possible to remove the pipe after identifying the blocked section, blow it with high-pressure air or hit with a heavy hammer or flush it with high-pressure water, and after it is thoroughly cleaned, connect the pipe to continue pumping concrete.