How does Saintyol DAWIN ensure the quality of my concrete machines?
- Share
- Issue Time
- Jan 9,2020
Once your order is confirmed, we will execute the whole fabricate design (DFM) review, so that our engineer think that maybe affect any quality problems of your concrete machines.Using a set of test equipment to check and confirm the all materials.The final inspection report before shipping.We are able to real-time sharing the inspection data with you, so we also can work together to solve any quality problems that you may encounter during the production process.